Data Centre Infrastructure Build
Project overview
A financial services company required a new data centre to support its growing IT operations. The project involved designing and building a Tier II data centre with redundant power, precision cooling, and comprehensive monitoring.
We delivered the complete data centre fit-out including power distribution, UPS systems, precision cooling, racks, containment, fire suppression, and environmental monitoring.
Project details
- Location
- Lagos, Nigeria
- Industry
- Information Technology
- Completion
- 2023
- Tier Rating
- Tier II
- IT Load
- 100 kW
- Project Duration
- 16 weeks
The challenge
The data centre needed to be built within an existing office building with limited floor space and structural constraints.
Our approach
We designed a compact, efficient layout using in-row cooling and high-density racks to maximize capacity within the available space.
What the project achieved