Solar Hybrid Power System Installation

Abuja, Nigeria/Completed 2022/Telecommunications Operator
Project photography

Project overview

A telecommunications operator needed to reduce diesel fuel consumption at its base station sites across Nigeria. We designed and installed a solar hybrid power system combining solar PV panels, battery storage, and the existing diesel generator.

The hybrid system significantly reduced generator runtime, fuel consumption, and maintenance costs while improving power reliability.

Project details

Location
Abuja, Nigeria
Industry
Telecommunications
Completion
2022
Solar Capacity
20 kWp per site
Battery Storage
40 kWh per site
Sites Deployed
15
01

The challenge

The sites were in remote locations with limited access, requiring careful logistics planning and robust system design for harsh environmental conditions.

02

Our approach

We designed a ruggedized hybrid system with remote monitoring, enabling the operator to track performance and schedule maintenance proactively.

Outcomes

What the project achieved

01Reduced diesel consumption by 70%
02Generator runtime reduced from 24 to 6 hours per day
03ROI achieved within 18 months
04Remote monitoring enabled predictive maintenance

Equipment and technologies used

Solar PVLithium-ion BatteriesHybrid InvertersRemote Monitoring